- MOD Headcount and Work Content
- Scrap Process rate
- Process Capablities
- Capacity Status and Process Cycle Time, including TRS Monitoring (data from plant)
- Rework monitoring (data coming from PDL and plant)
- Material Yield
- Launch Costs consolidated in the BP (estimated and followed by plant)
- Master's degree in engineering, or significant professional experience
- Minimum 5 years of proven experience in production or industrial area preferably in automotive sector
- Strong ability to work in an international and multicultural environment with complex matrix organization
- Strong Team spirit and positive mindset
- Leadership with ability to interact and coordinate complex subject with technical team
- Proactive with vision of long term impact and problem anticipation
- Knowledge in project management process, 7 Quality Basics, FES.
- Result oriented with strong written and oral communication skills
- Fluent English required, and customer's language strongly encouraged
Program Manufacturing Leader - Nanjing, 中国 - Faurecia
描述
Job DescriptionThe PML Engineer is a Program Core Team Member, in charge of the complete industrialization of the new production lines in all involved plants for a given program, achieving targets in terms of Timing, Capacity and Production Costs in line with PMS requirements.
His role is to define and implement the best Production System Concept making sure Group standards are applied, in coherency with the Faurecia Excellence System (FES) and FIS industrial strategy.
The Timeframe of his activity starts at Program Award until SOP + 3 months approximately.The PML reports directly to PML Manager and funcionnally to Program Manager.
Main responsibilities are:
1. Design to Manufacturing
The PML Participates to the Product Design activities led by the PDL (Program Development Leader), contributing in reaching a product design compliant with Faurecia Industrial Targets and allowing maximum Production Profitability.
He Leads Technology and Process comparative studies in case of several possible alternatives and makes sure Process Feasibility is given and validated by experts2. Footprint and Make or Buy Studies
With the support of his management and giver the program context, PML conducts the appropriate footprint studies and required Make or Buy comparative Studies.
PML submits it to the Industrial Strategy for final decision.3. Production System Definition
In the early phase of program, PML organizes, leads and follow-up the FES Industrial Design Workshop during Development Phase (EDW) involving full Program and Plant team, under the coordination of his PML manager.
Based on a first preliminary theoritical production layout delivered by the plant, he build the preliminary program theoritical plant internal MIFD.
Before Program CAR Committee Meeting, leads the FES Tool and machine Design Workshop (Cardboard), out of which plant delivers the detailed Production Line layout and internal MIFD.
Confirm the proposed Production System including traceability and conformity.Contributes and validates the MIFD, final layout.
PML identifies and follow-up Industrial risks and define the back-up plan for critical processes.
Check, share and take advantage of any relevant Lesson Learnt from similar process.
Provide Industrial Impact on any Engineering Change Request
PML leads the assessment of the refurbishment needs for the program relying on the appropriate internal or external experts and validate the effective equipment refurbishment
4. Process FMEA
PML participates in the definition of Key Product Characteristics (KPC) and Key Control Characteristics (KCC)
He coordinates and leads the PFMEA methodology during program phase with active participation of PTEs, Process Experts (GTS), Plant.
Once PFMA completed, ensure action implementation and PFMEA update according advancement and then transfer PFMEA to plant at MPT when all required action implemented.
5. CAR CommitteePML prepares and leads the Program CAR Presentation with Program and Plant Support and Validation.
He ensures Mcload update with additional equipment brought by program
Once CAR presented, he ensures CAR submission and follow-up according targeted industrial timing.
6. Industrial Timing
PML builds, updates & monitors the complete Program Industrial timing plan for tools, equipment, Packaging, Traceability and associated processes to reach MPT and SOP on time and right first time from specification to final acceptance.
He coordinates Program PTE and Supply Chain Engineers within Program Team and track Plants readiness level though IPMsThe PML is in charge of coordinating Traceability Implementation, Machines and tool Acceptance, making sure complete and robust PDCA is implemented and tracked.
Responsible to organize T&E progress status reviews involving the plant7. Industrial Performance
PML defines and tracks main Industrial Performance indicators:
PML is in charge of making sure that profitable solutions for Program Financial KPI improvement are investigated through standard, automation, digitalization with payback analysis.
He optimizes Program Investment through Reuse, Bundling, Massification etc.He also builds, updates & monitors the detailed Program Investment List, submitting CAR request and approval follow-up.
9. PMS-PRC Reporting
PML reports Manufacturing Milestones in Faurecia PMS system in coordination with Supply Chain, Plants and PTEs. He provides to Costing the Industrial target data for BP update
All PMLs participate to PML Department Weekly routine
Qualification: